Route
Verify city, county and overlay authority.
A private, plain-English permit workspace for owners screening a residential project, organizing the application file and preventing inspection surprises.
This is a screening and organization tool—not a permit determination, code opinion, plan review, inspection result, contractor authorization or permission to start/occupy.
Start with authorityVerify city, county and overlay authority.
Describe all building, trade and site work.
Control the correct forms, plans and versions.
Schedule before concealment and close corrections.
Preserve finals, certificates and approved plans.
Select only what you can verify. Annexation, ETJ, floodplain, plat, historic, HOA, utility and right-of-way controls can overlap.
Select every component. One deck with a sink and ceiling fan can create building, plumbing and electrical paths.
Preserve the exact version, receipt, reviewer comment and approval for every record.
Verified jurisdiction, address/parcel, ownership and applicant authority
Existing condition, exact work, dimensions, systems, demolition and intended use
Property lines, setbacks, easements, structures, utilities, drainage and proposed work
Floor/roof/framing details, elevations, energy/code details and product information as required
Designer/engineer/architect and licensed trade information where required
City registration, state license, insurance and permit responsibility verified
Historic, floodplain, septic, right-of-way, HOA, utility or other approvals identified
Correct record type, contacts, forms, signatures, attachments and current fee path
Every review comment has an owner, response, revised sheet and resubmission receipt
Issued permit, approved plans, inspection results, correction proof and final/CO documents
The issued permit and inspector determine the actual sequence. Schedule using the correct record and preserve results.
Permit posted, approved plans on site, utility releases and required preconstruction checks
Excavation, reinforcement, plumbing/electrical underground before concealment
Framing, shear, connectors, fire blocking and structural corrections before cover
Electrical, plumbing, gas and mechanical rough inspections before concealment
Insulation, air sealing and required energy/code documentation
Required fastening, fire-resistance or moisture assemblies before finish
Life safety, egress, guards, stairs, finishes, address and approved-scope completion
Trade finals, correction closure, certificate/final record and owner file
Rules, forms, portals, fees and procedures change. Use the current official record for the verified jurisdiction and scope.
Official City routing, homeowner/contractor paths, project types and commonly required documents.
Official starting list for limited work that may not require a building permit; scope and overlays still matter.
Official application, permit, document, contact and inspection portal starting point.
Official application, contact, licensed-professional, site-plan, trade-permit and inspection guides.
Official contractor registration search and City complaint/sanction information.
Official County explanation of permit verification and when the Fire Marshal path applies outside municipalities.
Official Public Works portal for building, floodplain, right-of-way and post-construction permit categories.
Official unincorporated-area authority, residential distinctions, construction inspections and certificate FAQ.
Official state verification for regulated trades and occupations.
No. Mailing address, ZIP code, school district and utility provider do not establish municipal limits. Confirm jurisdiction using official maps/records or the authority before choosing a form.
No, but the exemption depends on exact scope and authority. Structural changes, additions, roofing, foundation and licensed trade work commonly trigger different paths. Historic, floodplain, HOA or utility approvals can still apply.
Sometimes, for specified work and facts. San Antonio describes homeowner paths and limits, including licensed-trade requirements and a narrow plumbing-homestead route. Do not assume owner application permits unlicensed work.
The owner remains exposed to property, contract, code, sale and insurance consequences. Require the scope and authority/source in writing and independently verify it before work.
Yes. Building, electrical, plumbing, mechanical, demolition, right-of-way, floodplain, septic, historic and utility paths can overlap. Screen the entire scope and site.
Submitted means the authority received something; issued means a specific permit authorizes defined work subject to conditions; inspections document stages; final/closeout confirms the applicable record reached its completed state.
Do not assume. The issued record, approved plans, reviewer/inspector directions and authority control. Work that deviates or conceals an inspection stage can create rework or enforcement.
Use the City contractor search for local registration and the applicable Texas licensing agency for regulated trades. Match person/company, license number, status, scope and permit record—not only a business name.
County building authority differs by use and project. Private single-family residential work can be treated differently, but floodplain, septic, right-of-way, plat, drainage, fire or voluntary permit paths may still apply. Contact the relevant County offices before construction.
No. Government approval generally does not grant private HOA/deed permission, property rights, lender approval or insurance coverage. Those are separate controls.
Bexar County Home Buyers can provide a no-obligation as-is property option for comparison. We do not issue permits, determine compliance, cure records, manage contractors or claim selling is the best answer.